Change Order Of <li> Item?
Jul 9, 2010
Is it possible to change order of <li> item with JavaScript by using a string variable? The string variable is coming from <%=(Recordset2.Fields.Item("neworder").Value)%>. The string variable value may be 1,2,3 or 2,3,1 or 3,2,1. I would like the numbers in the string variable represent the <li> order or positions.
<ul>
<li><%=(Recordset2.Fields.Item("image_code_A").Value)%></li>
<li><%=(Recordset2.Fields.Item("image_code_B").Value)%></li>
<li><%=(Recordset2.Fields.Item("image_code_C").Value)%></li>
</ul>
[Code]....
View 2 Replies
ADVERTISEMENT
Feb 17, 2009
I am trying to get the order of list item in an unordered list. Here is the mark up
Code HTML4Strict:
<ul id="list1">
<li>ul1 item 3</li>
<li>ul1 item 2</li>
<li>ul1 item 1</li>
</ul>
[Code]...
View 1 Replies
View Related
Jul 3, 2009
I am new to js.my project req is I want to create the dynamic menu in php and the menu I took it from database as it is dynamic. I am able to do that. But in the back end admin can change the order of menu. For that I need to write the script. Admin will enter the menu items. Table is menureg:menuid is the primary key. After entering the detils he can able to see all the menu items wth the edit and delete options. Now my requirement is meanwhile I need to change the order of the menu along with those options I need to use change order button to move the menu up and down. After changing the order it should display in front page.
View 1 Replies
View Related
Sep 24, 2006
I'm using this script to allow people to populate form fields just by hitting the words from a list that most appeal to them. The idea is that on clicking a word the field is filled in and then "focus" is moved to the next one. I say "focus" because it's not actual focus, but "virtual focus" held in a js variable. Code:
View 2 Replies
View Related
May 28, 2011
I use PHP to create an HTML table with information from a database, ordered by date. Some of the rows of the table have a class named "new", while the others don't have any class. What I would like to do is to have all the rows with class "new" shown as last rows of that specific date.
So for example:
Code:
<tr>...<td>01-01-2011</td>...</tr>
<tr>...<td>01-01-2011</td>...</tr>
<tr class="new">...<td>01-01-2011</td>...</tr>
<tr class="new">...<td>01-01-2011</td>...</tr>
Is this possible using javascript/jquery?
View 7 Replies
View Related
Nov 4, 2010
I want a effect like,when I mouse hover on a image,the position below would diaplay a tooltip box:
The fact is that:when the mouse mouseover the img,the <div class="tooltip"> would appear,but when the mouse mouseout the img ,the tooltip disappeared,however I have already write the:
How can I get the right effect?
View 1 Replies
View Related
Feb 5, 2009
Anyway my aim here is to have x,y, or z Div come to the front onClick.
how to do it with two Div's (using the code below) but not with 3 or more. I'm not attached to the code,
<script>
function changeZunder() {
layer1.style.zIndex = 1;
layer2.style.zIndex = 2;
[Code]....
View 6 Replies
View Related
Dec 3, 2009
Is there a way to make the order of tags in a Tag Cloud change every time the page is refreshed?
View 24 Replies
View Related
Oct 25, 2010
i've being trying to change the src of a img tag in order to create some kind of a sequence of images.
Code:
<script type="text/javascript">
var i=0;
[code]....
View 6 Replies
View Related
May 26, 2011
I want the images to change (rotate) in sequence when the page is refreshed not random like i have below. Also I also need text to change on refresh to because I am going to have a descritption of the image below. So the image and text sync up together when some refreshes the page or goes page to the home page.I want the images to change like on this page Loading A Specific Image Sequence On Page Refresh Via JavaScript / DOM
Code:
<script type="text/javascript" language="JavaScript">
var imgs = new Array('<a href="VW_1.shtml"><img border=0 src="img/samples/VW/large_1.jpg" width=165 height=109" class="thumbnail_img">',
'<a href="fortshelby1.shtml"><img border=0 src="img/samples/Fort Shelby/image1-large.jpg" width=165 height=109 class="thumbnail_img">',
'<a href="jaguar1.shtml"><img border=0 src="img/samples/Jag_of_Novi/large_1.jpg" width=165 height=109 class="thumbnail_img">', .....
var max = imgs.length;
var num = Math.floor((Math.random() * max));
document.writeln(imgs[num]);
</script>
View 3 Replies
View Related
Mar 9, 2010
I am using the following function in order to change an image opacity on a mouseover and mouseout. This function works fine but does not handle a onClick. What I mean by this is...... How can I create/alter the function to handle an onclick? I want to be able to click on an image (one of many) and have that image opacity change to 50%. There are other similar images whose opacity would need to remain at 100%. If one of those are clicked, that images opacity would then change, and the previous would restore to original value of 100% I thought about passing the clicked images id to the function but I can't find a way to compare an image id VS a passed image id.
[Code]...
View 2 Replies
View Related
Jan 4, 2010
looking for a script or list component that allow to change order by drag & drop
View 2 Replies
View Related
Mar 31, 2010
I'm attempting to physically change the index order of the elements returned by a selector.For example, I'm attempting to make it so when someone clicks on a button, it swaps the index position of the element above or below it (depending on which button they press).I tried to assign it using something like $('.draggable :eq(2)').attr('index', 3)But it didn't seem to work. Is there a way to do it using jQuery, or do I have to change it within DOM itself? Or is there another way to do it?
View 2 Replies
View Related
Jul 24, 2004
How can i precache those menu pics in order to make them change immediately on mouse over?
[url]
View 14 Replies
View Related
May 19, 2010
I want to use a timed function (with setInterval()) in order to change the color off the chars in a word. I use jQuery fadeOut() and fadeIn() effects.
In Firefox this works good, but in IE 6 don´t... the last char didn´t appear ! The code is:
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd">
<html xmlns="http://www.w3.org/1999/xhtml" lang="pt-br">
<head>[code]......
View 2 Replies
View Related
Oct 23, 2007
i have a select box and it's option values are from 1 to 10.when i select any number from the select box it should take me to upload.php
i want onchange event.following is my code.but it is not working.i want to open upload.php in the same browser not in the new window.
<select name="uploadNeed" onchange="window.open(this.options[this.selectedIndex].value,'upload.php')" id="uploadNeed" class="ti">
View 2 Replies
View Related
Jan 7, 2010
I have a drop down menu with a few options of delivery method. One option is "other" and when a user selects other a new text box appears for them to specify. this is using javascript to change the css class of the div containing textbox. all this works fine and user can change between options resulting in textbox appearing when selected other and disappearing when selecting anything else. however if the user selects other and enters text into textbox then chages their mind and selects a new option the textbox will disappear but the value that was entered remains the same, i need to default when textbox is hidden to reset value.
View 4 Replies
View Related
Aug 5, 2011
I am trying to change the look of the 'active' submenu item... Meaning, when you're on a certain page - the corresponding submenu item will look different (i.e. bold, different color, etc.)... URL is --> IDC's Fundamentals for Newer Directors JS code I'm using -->
$("*").find("a[href='"+window.location.href+"']").each(function(){
$(this).addClass("submenuactive")
})
View 16 Replies
View Related
Jan 5, 2010
I am trying to check if a list item has a class of selected, then is so change the opacity to 0.5. Here is my code:
[Code]....
View 6 Replies
View Related
Apr 5, 2011
I don't know why it's not working... But I want to change the background-location-y when I hover a list item. [URL]..
View 6 Replies
View Related
Apr 28, 2009
This is for an online quiz that collects selected answers through hidden checkboxes, and when a checkbox is selected the javascript changes the background of that selected item. However the problem is when javascript is disabled the whole thing won't work because the checkboxes have a class of .hide which, obviously, hides them and the user can't see that they've actually selected an item as the background color won't change. So I was thinking that instead the javascript could apply the class of hide to the input. That way if it's disabled the checkboxes will show.
<style type="text/css">
.hide { display:none;
*display:block;
*margin:0;
*padding:0;
*width:0px;
}
</style>
[Code]...
View 1 Replies
View Related
Oct 1, 2009
I have a website with several pages. Each page having the same menu.I need one of this menu item's text to vary according to each of my customers, where the customer id will be passed from an external link at launch time.I also need to change the menu item link <a href.../a> dynamically.I'm planning to create a redir.html pacge for each client and within that page, I can insert a url with parameters to launch the main page.
View 1 Replies
View Related
Aug 25, 2010
I've been struggling trying to get a small order form to work the way I want it to. Here is a link to the live page: [URL] And here is the code in question:
[Code]...
I have two questions...
Question 1 How can I make this piece of script act a little smarter. Look at the order form, I'm catering for up to 4 people and providing lunch for them. If they select 3 people and the spaghetti bol for lunch, it's only adding $10 where it should be adding $30. Obviously this is simple multiplication but since the values in my form are prices it makes it a little tricky. I'm guessing an onselect on the first part of the form which changes the pricing of the other items would be the way to go, but how do I do this?
Question 2 The "Total Price" is placed before the <form> tag by the script. This is ok but it's not where I want it. How can I position this text elsewhere in the document?
View 3 Replies
View Related
Nov 19, 2011
I am implementing auto re-order drop down values in asp.net. My requirement is something: I have five drop down and each has populated using 1 to 5 values. when I changevalue from dropdown, other drop down values(numberordering)should change automatically.
View 1 Replies
View Related
Jan 24, 2011
I have this order form where the customers can change the quantity by intput in a text field.I would like to have the text field changed with select fields, but doing so in the form, the script is not doing anymore.Can anyone have a look and tell me what to change in the scritp to accept select fields in place of the text fields.
View 5 Replies
View Related
May 11, 2010
$(document).ready(function(index){
$(connectSort).each(function(index, obj){
$("." + this).sortable({
connectWith: ".connectedSortable_" + this,
[Code]....
the first function(start: function ..) displays an attribute (title) of the dragged item once the sorting starts. supposedly, the second function (stop: function ..) would display the same attribute but of the item replaced by the dragged item once the sorting stops.
I have tried a lot of things already, but none seems to work.
View 2 Replies
View Related